Difference between revisions of "CH DD Ga"

From New IAC Wiki
Jump to navigation Jump to search
 
Line 4: Line 4:
  
 
First gallium sample removed from source vault at 4:00pm, 9/4/22. Inserted into shielded HPGe tunnel at 4:01pm and covered. -> Run number: r7231.
 
First gallium sample removed from source vault at 4:00pm, 9/4/22. Inserted into shielded HPGe tunnel at 4:01pm and covered. -> Run number: r7231.
 +
 +
* 3.1 days (267960 seconds) spent with surface contact with Cf252 source.
  
 
----
 
----

Latest revision as of 22:05, 4 September 2022

First gallium sample deposited into source vault at 1:34pm, 9/1/22.

Background run for sample 1: r7229

First gallium sample removed from source vault at 4:00pm, 9/4/22. Inserted into shielded HPGe tunnel at 4:01pm and covered. -> Run number: r7231.

  • 3.1 days (267960 seconds) spent with surface contact with Cf252 source.

Go Back

User:Harpconn