Difference between revisions of "Beamline design (Y. Kim)"

From New IAC Wiki
Jump to navigation Jump to search
 
(5 intermediate revisions by 2 users not shown)
Line 1: Line 1:
 
= Beam Line Design=
 
= Beam Line Design=
 
[[File:BeamLine_Yim_10-14-10.png | 400 px]]
 
[[File:BeamLine_Yim_10-14-10.png | 400 px]]
 +
 +
 +
Need:  more X-Y steerers(1 set after 1st triplet), belows at the exit of Linac, Torroid loop at exit of Linac, fast shutdown valve at Linac exit.
  
 
== Distances==
 
== Distances==
 
{| border="1" cellpadding="5" cellspacing="0"
 
{| border="1" cellpadding="5" cellspacing="0"
 
|-
 
|-
| Element || Distance to Center
+
| Element || Distance to Center || Stancari Design
 
|-
 
|-
 
|End of LinacGate Valve || 0.000 m  
 
|End of LinacGate Valve || 0.000 m  
Line 19: Line 22:
 
|1STTG || 1.175 m  
 
|1STTG || 1.175 m  
 
|-
 
|-
|Q1@T2 || 1.400 m  
+
|Q1@T2 || 1.400 m || 1.4
 
|-
 
|-
|Q2@T2|| 1.650 m  
+
|Q2@T2|| 1.650 m || 1.6 (Yujong has 5 cm more space between quads)
 
|-
 
|-
|Q3@T2 || 1.900 m  
+
|Q3@T2 || 1.900 m || 1.8
 
|-
 
|-
 
|TCOL2 || 2.250 m  
 
|TCOL2 || 2.250 m  
 
|-
 
|-
|KIWI1 || 2.525 m  
+
|KIWI1 || 2.525 m || 2.201 (Yujong has 22.4 cm more distance between last quad and dipole)
 
|-
 
|-
 
|SLIT || 2.851 m  
 
|SLIT || 2.851 m  
 
|-
 
|-
|Q1@DM || 3.026 m  
+
|Q1@DM || 3.026 m || 2.615 (Yujong has 8.7 more cm between dipole and quad)
 
|-
 
|-
 
|SCREEN || 3.296 m  
 
|SCREEN || 3.296 m  
Line 37: Line 40:
 
|KIWI2 || 3.617 m  
 
|KIWI2 || 3.617 m  
 
|-
 
|-
|Q1@T3 || 4.063 m  
+
|Q1@T3 || 4.063 m ||  Yujong has 29.1 cm leess distance between last dipole and quad)
 
|-
 
|-
 
|Q2@T3 || 4.603 m  
 
|Q2@T3 || 4.603 m  
Line 57: Line 60:
  
 
[[File:HRRL_BeamSize_10-14-10.png|200 px]]
 
[[File:HRRL_BeamSize_10-14-10.png|200 px]]
 +
 +
 +
=Expected electron Transmission=
 +
 +
;Assuming a 9 mm wide slit in between the kiwi dipoles.
 +
 +
[[File:HRRL_E-transmission_10-14-10.png | 200 px]]
 +
 +
= Expected electron profile after last Kiwi dipole=
 +
 +
[[File:HRRL_e-Profil_10-14-10.png | 200 px]]

Latest revision as of 18:53, 21 March 2011

Beam Line Design

BeamLine Yim 10-14-10.png


Need:  more X-Y steerers(1 set after 1st triplet), belows at the exit of Linac, Torroid loop at exit of Linac, fast shutdown valve at Linac exit.

Distances

Element Distance to Center Stancari Design
End of LinacGate Valve 0.000 m
Q1@T1 0.175 m
Q2@T1 0.425 m
Q3@T1 0.675 m
TCOL1 1.025 m
1STTG 1.175 m
Q1@T2 1.400 m 1.4
Q2@T2 1.650 m 1.6 (Yujong has 5 cm more space between quads)
Q3@T2 1.900 m 1.8
TCOL2 2.250 m
KIWI1 2.525 m 2.201 (Yujong has 22.4 cm more distance between last quad and dipole)
SLIT 2.851 m
Q1@DM 3.026 m 2.615 (Yujong has 8.7 more cm between dipole and quad)
SCREEN 3.296 m
KIWI2 3.617 m
Q1@T3 4.063 m Yujong has 29.1 cm leess distance between last dipole and quad)
Q2@T3 4.603 m
Q3@T3 5.143 m
SCREEN 5.712 m
2NDTG 6.112 m
HOLE@WALL 6.412 m

Beam Optics

Kim HRRL Optics 10-14-10.png

Beam Size

HRRL BeamSize 10-14-10.png


Expected electron Transmission

Assuming a 9 mm wide slit in between the kiwi dipoles.

HRRL E-transmission 10-14-10.png

Expected electron profile after last Kiwi dipole

HRRL e-Profil 10-14-10.png