40MeV BeamLineInstall 10252013
Beam Line Budget
Without 6 cross
| Cost ($) | Description |
| 318 | Bellows |
| 158 | Hardware (nuts & bolts) |
| 290 | 5 rotatable flanges |
| 335 | non-rotatable flanges |
| 7' + 6' + 3' SS pipe lengths | |
| 250 | turning pipe on lathe |
| 2400 | 2 days of labor building beam line and 1 day installation |
With 6 cross
| Energy (MeV) | dE/dx for e- (MeV/cm) | dE/dx for e+ (MeV/cm) |
| 8 | 4.54 +/- 1.05 | 4.40 +/- 1.03 |
| 5 | 4.36 +/- 1.11 | 4.22 +/- 1.08 |
| 3 | 4.12 +/- 1.19 | 4.03 +/- 1.16 |