PePPO 2012Run
Jump to navigation
Jump to search
Jan 22, 2012 Readiness Review
Currently scheduled Injector recovery on October 22
Positrons May be November 4 & 5
Currently max energy is 7.8 MeV.
Choosing 6.3 MeV incident electron energy because that is the most stable.
= 0.5 mm on the Tungsten target (T1)
June | Racks installed and cables pulled to tunnel |
August 2011 | vacuum pumps ready, Compton Polarimeter Table installed |
September 2011 | Beam Line installed |
October 2011 | Finish Work in Injector area for PePPO |
October 17-19, 2011 | Swing shift hot checkout |
October 29-Nov 1 2011 | Owl shift PePPo tuning (Probably install Annihilation counter here) |
Nov 11-16 2011 | Day shift PePPo running |