Install fixtures

8/9/11

Installed the crane


Brought down the platforms


Bring down the scissor lifts

8/17/11

Install A-Frame for mounting DCs

Mounting Sector 1 DC

Changing Room

8/23/11

Finished installing the changing room. The changing room is used to put on clean room apparel prior to entering the clean room. A HEPA filter is placed on top of the room and set to high in order to blow particles off a person before they enter the clean room.

We still need to install a hard door between the changing room and the clean room.

Clean Room 8/23/11