PePPO 2011Run
PePPO run
Currently scheduled Injector recovery on October 22
Positrons May be November 4 & 5
Currently max energy is 7.8 MeV.
Choosing 6.3 MeV incident electron energy because that is the most stable.
= 0.5 mm on the Tungsten target (T1)
June | Racks installed and cables pulled to tunnel | |||
August 2011 | vacuum pumps ready, Compton Polarimeter Table installed | |||
September 2011 | Beam Line installed | |||
October 2011 | Finish Work in Injector area for PePPO | |||
October 17-19, 2011 | Swing shift hot checkout | |||
October 17-19, 2011 | Swing shift hot checkout | |||
October 29-Nov 1 2011 | Owl shift PePPo tuning | - | Nov 3-6 2011 | Day shift PePPo running |
Region 3
Cable length are 75-100 feet long
2 NaI detectors
one has mirror between it and the port window to reflect light to a camera.
See if we can send out one of our actuators to move the mirror in and out.