PePPO 2011Run
PePPO run
Currently scheduled Injector recovery on October 22
Positrons May be November 4 & 5
Currently max energy is 7.8 MeV.
June | Racks installed and cables pulled to tunnel |
August 2011 | vacuum pumps ready, Compton Polarimeter Table installed |
September 2011 | Beam Line installed |
October 2011 | Finish Work in Injector area for PePPO |
Region 3
Cable length are 75-100 feet long
2 NaI detectors
one has mirror between it and the port window to reflect light to a camera.
See if we can send out one of our actuators to move the mirror in and out.