PePPO 2011Run
PePPO run
Currently scheduled Injector recovery on October 22
Positrons May be November 4 & 5
Currently max energy is 7.8 MeV.
October 2011 || Finish Work in Injector area for PePPO
September 2011 || Beam Line installed
August 2011 || vacuum pumps ready, Compton Polarimeter Table installed
Region 3
Cable length are 75-100 feet long
2 NaI detectors
one has mirror between it and the port window to reflect light to a camera.
See if we can send out one of our actuators to move the mirror in and out.