HRRL Alignment 2011

From New IAC Wiki
Jump to navigation Jump to search

Alignment

Timeline

Completion Date Task
4/29/11 remove HRRL Gun
5/2/2011 Install alignment laser
5/3/2011 Install rotation and translation stages
5/9/2011 Align zero degree beam line
5/12/2011 Align 45 degree beam line
5/13/2011 Align 90 degree beam line

Procedure

Equipment

Precision Rotation Stage

Thor Labs 1 arc sec resolution, 5 arc min accuracy, Rotator $2425, APT controller $1600,


Elliot Scientific Manual rotation, 5 arc sec resolution, $600


Primatics $11k


Positrons