IAC LeadFlourideCherenkovCrystalTests 5-09
http://clasweb.jlab.org/wiki/index.php/Hall_A_IAC_Tests
Previous Tests: IAC_LeadFlourideCherenkovCrystalTests
Run Plan
Summary
| Task | Time Budget |
| Beam setup | 0.5 days |
| Testing 20 new blocks | 2.5 days |
| Silicon test | 1.0 day |
| Bleaching/Re-irradiation test | 0.5-1 day |
| Testing old blocks | 12 blocks/day |
- Accelerator Settings
| beam energy | 20 MeV |
| Rep Rate: | 30 Hz |
| I_peak: | 60 mA/pulse |
| pulse width: | 0.1 s (100 ns) |
Day 1
|
Beam setup & 2-3 hours\\ Irradiation batch \#1:&3 new blocks + 1 old ``reference block\\ Irradiation {\bf batch \#2}:&4 new blocks\\ Bleaching of batch \#2:&29 hours\\ Irradiation batch \#3:&4 new blocks\\
Day 2Irradiation batch \#4:&4 new blocks\\ Irradiation batch \#5:&4 new blocks\\ Irradiation {\bf batch \#2}:&4 new blocks\\ Bleaching of batch \#2:&24 hours\\ Day 3\multicolumn{2}{l}{Silicon test}\\ Irradiation {\bf batch \#2}\\ Bleaching of batch \#2:&38 hours\\ = Day 4Irradiation batch \#6:&4 new blocks\\ Irradiation batch \#7:&4 new blocks\\ Irradiation batch \#8:&4 new blocks\\ Day 5Irradiation {\bf batch \#2}\\ \multicolumn{2}{l}{Silicon test}\\ Day 6 -- Bleaching of batch \#2:&24h\\ 5/11/09 |