CH DD Ga
Jump to navigation
Jump to search
First gallium sample deposited into source vault at 1:34pm, 9/1/22.
Background run for sample 1: r7229
First gallium sample removed from source vault at 4:00pm, 9/4/22. Inserted into shielded HPGe tunnel at 4:01pm and covered. -> Run number: r7231.
- 3.1 days (267960 seconds) spent with surface contact with Cf252 source.