Determining and Verify Shield Limits

From New IAC Wiki
Revision as of 15:51, 27 October 2018 by Vanwdani (talk | contribs) (Created page with "File:MollerShieldDraftingView.png Images taken from cadBeamline/cadBeamlineFTOFF File:cadBeamlineFTon_Mathematica.pngFile:cadBeamlineFTOFF_Mathematica.png Dete...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

MollerShieldDraftingView.png

Images taken from cadBeamline/cadBeamlineFTOFF

CadBeamlineFTon Mathematica.pngCadBeamlineFTOFF Mathematica.png


Determining what the shield components are using Mathematica, gcards are modified to call Modified cadBeamline and cadBeamlineFTOFF files without the shield components.

FTOn_ShieldIn:

FTon ShieldIn MathematicaTest.png

FtOn_ShieldOut:

FTon ShieldOut MathematicaTest.png

FTOff_ShieldIn:

FTOff ShieldIn Mathematica Test.png

FTOff_ShieldOut:

FToff ShieldOut Mathematica Test.png


According to cad.gxml within cadBeamline: For the FTON configurration the cone is shifted by -238.8mm



For integrating the rate within the shield area, this implies: For the components of FTOff, starting at the cone-tip and running to the lead shield

[math] 458.2\ to\ 1799.3cm[/math]


For the component of FTOn, starting at the main-cone (the only component)

[math]FTOn\ 458.2+103.0-23.8=537.4\ to\ 1420\ cm[/math]