11/1/2013
- Goals
- Confirm signals on all of Sector 5's sense wires
- Finish HV burnin: S:F:G = 1500:-750:536 and the current draw is less than 1 uA CLAS12_R1_S5_QA
- After the above is completed, stop gas flow, Install dust covers, prepare for shipping
- Test TDC integrity using DAQ and S1
- 11/8/2013
- Worked with Haitham on Sector 5
- Moved Kraken to SL2
- Began confirming signals on S5 sense wires S5 Testing and Performance Summary
- Add missing oscilloscope image SL2-STB6-K1200872 U10
- Confirmed with Haitham that HV burin is completed for SL2 R1S5_SL2_BurnIn
- Rotated Sector 3 with David
- 11/16/2013
- Confirmed signals on S5 SL2 sense wires. Found eight wires not listed in S5 Testing and Performance Summary without signal. Will test again to verify.
| Super Layer |
STP Board |
Wires without any Signal |
Notes
|
| SL2 |
STB1-K1200874 |
1,4,19 |
|
| SL2 |
STB2-K1200875 |
0 |
|
| SL2 |
STB3-K1200873 |
0 |
|
| SL2 |
STB4-K1200869 |
83 |
|
| SL2 |
STB5-K1200871 |
- |
Was unable to get signal on board for any wire. This board is currenty being debugged. All boots out.
|
| SL2 |
STB6-K1200870 |
1 |
|
| SL2 |
STB7-K1200872 |
7,19,67,72,82 |
U67 has a lot of noise.
|
- SL2 has been in HV burnin: S:F:G = 1500:-750:536 and the current draw is 1-2 uA on the sense wires. Has not gone down after a week.
- 11/21/2013
- The 2 Fold HV Power Supply still reading between 1-2 uA. Could be readout on power supply. According to Wiki the burnin for S5 SL2 is complete.
- Retested signals on seven wires not listed in Testing Summary for signal. Could get signal on five of the wires checked.
| Super Layer |
STP Board |
Wires without any Signal |
Notes
|
| SL2 |
STB1-K1200874 |
1,19 |
Noise, but no signal. U19 has large noise as seen previously on STB7-U67
|
| SL2 |
STB4-K1200869 |
- |
|
| SL2 |
STB7-K1200872 |
7 |
|
File:U67Bad.png
- Available times
- Monday 9-5
- T,Th 9-3
- W,F 12-5
Weekly progress meeting at 10 am Mondays
CLAS12_R1