Beam Test Jul 23 2012
Tune and deliver positrons
Tune it to Chad's tune from last run: Beam_Test_Jul_20_2012#Chad.27s_Tune
Positrons observed on the 90 degree scintilator.
DAQ runs
Detector2 -> Detector Beam Left (DL)-> CH6. IAC_NaI_Detectors#Det2
Detector3 -> Detector Beam Right (DR)-> CH5. IAC_NaI_Detectors#Det3
Run# Reprate T1 T2 FADC THR Start Time Stop Time Int Rate(Events/S) conditions. 3636 8 Hz in in DL=5,DR=4 09:49:49 10:03:39 2.4334 3637 8 Hz in in DL=5,DR=4 10:04:08 10:20:16 2.1641 3638 8 Hz in in DL=5,DR=4 10:24:05 10:27:45 2.51 3639 100 Hz in in DL=5,DR=4 10:31:04 10:31:04 8.1764 3640 100 Hz in out DL=5,DR=4 11:33:00 11:33:00 7.5097 3641 100 Hz in in DL=5,DR=4 11:48:20 13:08:29 8.7303 2 in Pb in front of the DL. 3646 100 Hz in in DL=33,DR=19 14:07:13 14:24:20 6.1410 Co-60 source in front of DR.