PePPO 2012Run

From New IAC Wiki
Revision as of 15:59, 23 November 2011 by Foretony (talk | contribs)
Jump to navigation Jump to search


Currently scheduled Injector recovery on October 22

Positrons May be November 4 & 5


Currently max energy is 7.8 MeV.


Choosing 6.3 MeV incident electron energy because that is the most stable.

[math]\sigma[/math] = 0.5 mm on the Tungsten target (T1)


Date Task/Item
Jan 22, 2012 Readiness Review


Positrons