AW CLAS12R1

From New IAC Wiki
Revision as of 16:15, 11 November 2013 by Wellali3 (talk | contribs)
Jump to navigation Jump to search

11/1/2013

Goals
  1. Confirm signals on all of Sector 5's sense wires
  2. Finish HV burnin: S:F:G = 1500:-750:536 and the current draw is less than 1 uA CLAS12_R1_S5_QA
  3. After the above is completed, stop gas flow, Install dust covers, prepare for shipping
  4. Test TDC integrity using DAQ and S1
11/8/2013

Worked with Haitham on Sector 5

  1. Moved Kraken to SL2
  2. Began confirming signals on S5 sense wires
  3. Add missing oscilloscope image SL2-STB6-K1200872 U10

Confirmed with Haitham that HV burin is completed for SL2

Rotated Sector 3 with David
Available times
Monday 9-5
T,Th 9-3
W,F 12-5


Weekly progress meeting at 10 am Mondays

CLAS12_R1