GEM performance data graphs

From New IAC Wiki
Revision as of 18:34, 23 September 2013 by Abdehait (talk | contribs)
Jump to navigation Jump to search

IAC runs

ADC is connected,

Beam On: run 5496 as the detector is on 13:31:11 13:47:18 run 5497 as the detector is off 13:52:51


Run Number Beam Start Time End time Notes
5496 on 13:31:11 13:47:18 Detector is in operating voltage.
5497 on 13:52: 51 Detector is in off mode
5515 off 5:59: 46 6:27:43 Detector is in operating voltage.
5516 off 6:29:32 06:38:13 Detector is in off mode
5517 off 6:43:42 06:50:05 shutter is close
5518 off 06:55:59 07:06:57 Detector is in operating voltage.
5519 on 07:56:53 Detector is in operating voltage.
5520,21,22 on 09:38:36 Detector is in operating voltage.
5523 on 9:51:00 10:13:38 Detector is in operating voltage.
5524 on 10:14:35 PMT is added to ADC ch#14
5526 on 11:51:35 12:02:49 PMT TDC ch#0 GEM ch#2 ADC ch# 12 GEM Ch#14 PMT
5528 on 12:21:28 13:35:26
5529 on 13:36:28 14:44:37
5530 on 14:45:24 15:09:16
5531 on 15:09:41 15:20:03
5532 on 15:23:31 15:31:00
5532 on 15:23:31 16:04:31
5532 on 16:05:00 16:04:31
5537 on 16:22:00 16:27:03
5541 on 16:42:02 16:27:03

All the previous runs has a positive input to the ADC.

Tuesday 07/30/13
Run Number Beam Start Time End time Notes
5593 on 15:55:04 16:29:20 stable beam to the end of the run.
5594 on 16:36:19 17:03:52 stable beam to the end of the run.
5595 on 08:28:09 08:45:19 stable beam to the end of the run.
5596 on 08:47:16 10:06:37 stable beam to the end of the run.
5603 on but trasfered 13:31:30 14:38:02 shutter is close
Wednesday 08/21-22/13

- Detector voltage is 2300, 2800V GEM and Cathode successively. GEM has not any output to the TDC for 5773, 5774.



Run Number Beam Start Time End time Notes
5773 on beam on for 4-10s, overflow
5774 on beam on for 4-10s shutter is close, beam energy is 7.5 MeV
5775 on beam on for 4-10s shutter is open, beam energy is 7.5 MeV
5776 on beam on for 4-10s shutter is open, beam energy is 7.5 MeV
5777 on beam on for 4-10s shutter is close, beam energy is 7.5 MeV
5778 off 19:54:17 6:00:00 shutter is close 2.8, 3.4 G/C, Amp.6_6
5779 off 6:05:33 shutter is open 2.8, 3.4 G/C, Amp.6_6

09/23/13

Run Number Beam Start Time End time Notes
6087 on 11:58:23 beam on, ADC does not collect charge from the scintillator




IAC-Peak Sensing Measurements 09/01/13

IAC-Peak Sensing Measurements


IAC-QDC Measurements 09/18/13

IAC-QDC Measurements