HRRL Alignment 2011

From New IAC Wiki
Jump to navigation Jump to search

Alignment

Timeline

Completion Date Task
4/29/11 remove HRRL Gun
5/2/2011 Install alignment laser( Khalid's 2'x3' table in HRRL doorway)
5/3/2011 Install rotation and translation stages
5/9/2011 Align zero degree beam line
5/12/2011 Align 45 degree beam line
5/13/2011 Align 90 degree beam line

Procedure

2 translators, one at least X feet. The long one is on the bottom and used to move a mirror from the zero port along the beamline to the expeimental celll. The second one is short and mounted on top of the long one. This will move along the HRRL axis

  1. Align laser through HRRL entrance and exit.
  2. place tanslators
  3. move translator along HRRL direction and position until laser spot doesn't move out of two Iris's at limits of translator breadboard.
  4. Not you are aligned along the HRRL axis
  5. Place mirror on translator and be sure laser beam goes back to HRRL gun.
  6. Rotate stage 45 degrees
  7. Move along the translator to center the laser as much as possible through the experimental cell wall. The 90 degree bend is now defined
  8. Install a mirror at D1 which rotates 45 degeee
  9. Move the other 45 degree mirror from the zero line alone the 90 degree line to the location of D2
  10. Be sure the laser shines back to the center of the Gun location
  11. The location of the mirror at D2 which aligns everything up will tell you the location of D2.
  12. once the location of D2 is established, the location of D1 will be known.
  13. Remove the Mirror at D1 and


Should we increase the dipole gap? From 3/4" to what?

Equipment

Precision Rotation Stage

Thor Labs 1 arc sec resolution, 5 arc min accuracy, Rotator $2425, APT controller $1600,


Elliot Scientific Manual rotation, 5 arc sec resolution, $600


Primatics 50 arc sec accuracy, $11k


  1. Khalid's laser table 2' x 3' I

Positrons