Beamline Drawing 2011 J.Ellis
Jump to navigation
Jump to search
Below is the Beamline sketch
Label | Beam Line Element | Z location from Gate Valve | Dimensions of Element |
G1 | Fast Gate Valve | 0.000 m | |
STXY1 | X-Y steerers 1 | ||
Q1 | First Quad | 0.175 m | |
Q2 | Second Quad | 0.425 m | |
Q3 | Third Quad | 0.675 m | |
STXY2 | X-Y steerers 2 | ||
Targ1 | positron production target | 1.175 m | |
Q4 | Fourth Quad | 1.400 m | |
Q5 | Fifth Quad | 1.650 m | 1.6 (Yujong has 5 cm more space between quads) |
Q6 | Sixth Quad | 1.8 | |
STXY3 | X-Y steerers 3 | ||
F1 | OTR Flag | ||
FC1 | Faraday Cup 1 | ||
D1 | First Kiwi Dipole | 2.525 m | 2.201 (Yujong has 22.4 cm more distance between last quad and dipole) |
SLIT | 2.851 m | ||
STXY4 | X-Y steerers 4 | ||
Q7 | Seventh Quad | 3.026 m | |
F1 | Yag SCREEN | 3.296 m | |
D2 | Second Kiwi Dipole | 3.617 m | |
Q8 | Eigth Quad | 4.063 m | |
STXY5 | X-Y steerers 5 | ||
Q9 | Quad | 4.603 m | |
Q10 | Quad | 5.143 m | |
F3 | Third Flag | 5.712 m | |
Targ2 | Brehm target ladder | 6.112 m | |
HOLE@WALL | 6.412 m |