Things That Still Need to Get Done
• Vacuum pipe and radiator ladder (design)
• Graphite block with Pb sheet (design / fabrication)
• Pb collimator (design / fabrication)
• d20 target
• d20 target mount
• Get no detectors; high voltage (check them out)
• no detector mount / shielding (design / fabrication)
• Data acquisition electronics
- Discriminators
- Scalers
- Take the digital pulse, send it into a counter (scaler), and it gives us a number.
• Callibration procedure
• Beam position monitoring