PAS Experiment

From New IAC Wiki
Jump to navigation Jump to search

CH Task List

CH_PAS_Master_Timeline

Materials

PAS_Shielding

NaI_Detectors

PAS_Experimental_Setup

PAS_HPGe_Detector

PAS_He3_Detector

PAS_Experiment_Attenuation_Measurements

DAQ

CH_Reading_CODA_Data


DAQ2_Upgrade_Summer_2021

CAEN V785N ADC

VME modules

Data Acquisition

LB Thesis DAQ Writeup

Readout Controller

Readout Controller Configuration

Readout Controller Library

File:Readout Controller Library.pdf

File:MastersThesis.pdf By Warren Parsons

6/1/21

  • ADC/TDC readout still not functioning. Dr. Forest is going to work on rebuilding the setup
  • I will attempt to hunt down manuals for each module and I will compile them here if found - need to look at Jeff Burggraf's wiki entries as this issue may already have a solution
  • Second nim bin causing errors with modules when bin is close to full. Could be drawing too much current, Dr. Dale is sourcing new nim bin from IAC to replace. We have extras here but need [math]\pm[/math]6V and all tested are either non-functioning or have [math]\pm[/math]12V & 24 but no 6V

Experiment

PAS_Feasibility_Study_Runs

CH_Resources

CH_Code_Repository

CH_Isotope_Table

CH_ROOT_Nonuniform_Binning

Related Papers

See google drive for now



Contact me: Harpconn@isu.edu

User:Harpconn

UnderGraduate_Neutron_Correlations_Lab