11-11-2016
Jump to navigation
Jump to search
Horizontal accelerator side collimator 7 mm, horizontal cell side 19 mm. 3 in of Pb on D30 & D330, 2 in of Pb on upstream side of D210, wax in front of Pb on wall downstream of beam dump
Run # | D90 n Rate (Counts/pulse)E-3 | Target | Configuration |
---|---|---|---|
5446 | 0.53 | Th | 10.5 MeV , 2 ns FWHM pulse width , 1.1 A Peak , 180.4 Hz , Radiator 1" Al., discriminator thresh 50 mV, D30 @ -1450V and all other detectors at -1500 V , |
5447 | 0.34 | Th | 10.5 MeV , 2 ns FWHM pulse width , 1.1 A Peak , 180.4 Hz , Radiator 1" Al., discriminator thresh 70 mV, D30 @ -1450V and all other detectors at -1500 V , |
5448 | - | Th | 10.5 MeV , 2 ns FWHM pulse width , 1.1 A Peak , 180.4 Hz , Radiator 1" Al., discriminator thresh 30 mV, D30 @ -1450V and all other detectors at -1500 V , |
5449 | - | Th | 10.5 MeV , 2 ns FWHM pulse width , 1.1 A Peak , 180.4 Hz , Radiator 1" Al., discriminator thresh 40 mV, D30 @ -1450V and all other detectors at -1500 V , |
5450 | - | Th | 10.5 MeV , 2 ns FWHM pulse width , 1.1 A Peak , 180.4 Hz , Radiator 1" Al., discriminator thresh 60 mV, D30 @ -1450V and all other detectors at -1500 V , |