Difference between revisions of "AW CLAS12R1"
Jump to navigation
Jump to search
Line 35: | Line 35: | ||
|SL2||STB7-K1200872 ||7,19,72,82|| | |SL2||STB7-K1200872 ||7,19,72,82|| | ||
|} | |} | ||
+ | |||
+ | SL2 has been in HV burnin: S:F:G = 1500:-750:536 and the current draw is 2 uA on the sense wires. Has not gone down after a week. | ||
;Available times | ;Available times |
Revision as of 16:24, 18 November 2013
11/1/2013
- Goals
- Confirm signals on all of Sector 5's sense wires
- Finish HV burnin: S:F:G = 1500:-750:536 and the current draw is less than 1 uA CLAS12_R1_S5_QA
- After the above is completed, stop gas flow, Install dust covers, prepare for shipping
- Test TDC integrity using DAQ and S1
- 11/8/2013
- Worked with Haitham on Sector 5
- Moved Kraken to SL2
- Began confirming signals on S5 sense wires S5 Testing and Performance Summary
- Add missing oscilloscope image SL2-STB6-K1200872 U10
- Confirmed with Haitham that HV burin is completed for SL2 R1S5_SL2_BurnIn
- Rotated Sector 3 with David
- 11/16/2013
Confirmed signals on S5 SL2 sense wires. Found seven wires not listed in S5 Testing and Performance Summary without signal. Will verify Monday morning.
Super Layer | STP Board | Wires without any Signal | Notes |
SL2 | STB1-K1200874 | 1,4,19 | |
SL2 | STB2-K1200875 | 0 | |
SL2 | STB3-K1200873 | 0 | |
SL2 | STB4-K1200869 | 83 | |
SL2 | STB5-K1200871 | All | Was unable to get signal on board for any wire. This board is currenty being debugged. |
SL2 | STB6-K1200870 | 1 | |
SL2 | STB7-K1200872 | 7,19,72,82 |
SL2 has been in HV burnin: S:F:G = 1500:-750:536 and the current draw is 2 uA on the sense wires. Has not gone down after a week.
- Available times
- Monday 9-5
- T,Th 9-3
- W,F 12-5
Weekly progress meeting at 10 am Mondays