Difference between revisions of "AW CLAS12R1"
Jump to navigation
Jump to search
Line 9: | Line 9: | ||
;11/8/2013 | ;11/8/2013 | ||
:Worked with Haitham on Sector 5 | :Worked with Haitham on Sector 5 | ||
− | + | :Moved Kraken to SL2 | |
− | + | :Began confirming signals on S5 sense wires | |
− | + | :Add missing oscilloscope image SL2-STB6-K1200872 U10 | |
:Confirmed with Haitham that HV burin is completed for SL2 | :Confirmed with Haitham that HV burin is completed for SL2 | ||
:Rotated Sector 3 with David | :Rotated Sector 3 with David |
Revision as of 16:15, 11 November 2013
11/1/2013
- Goals
- Confirm signals on all of Sector 5's sense wires
- Finish HV burnin: S:F:G = 1500:-750:536 and the current draw is less than 1 uA CLAS12_R1_S5_QA
- After the above is completed, stop gas flow, Install dust covers, prepare for shipping
- Test TDC integrity using DAQ and S1
- 11/8/2013
- Worked with Haitham on Sector 5
- Moved Kraken to SL2
- Began confirming signals on S5 sense wires
- Add missing oscilloscope image SL2-STB6-K1200872 U10
- Confirmed with Haitham that HV burin is completed for SL2
- Rotated Sector 3 with David
- Available times
- Monday 9-5
- T,Th 9-3
- W,F 12-5
Weekly progress meeting at 10 am Mondays