#After the above is completed, stop gas flow, Install dust covers, prepare for shipping | #After the above is completed, stop gas flow, Install dust covers, prepare for shipping | ||
#Test TDC integrity using DAQ and S1 | #Test TDC integrity using DAQ and S1 | ||
11/8/2013 | |||
Worked with Haitham on Sector 5 | |||
Moved Kraken to SL2 | |||
Began confirming signals on S5 sense wires | |||
Add missing oscilloscope image SL2-STB6-K1200872 U10 | |||
Confirmed with Haitham that HV burin is completed for SL2 | |||
Rotated Sector 3 with David | |||
;Available times | ;Available times | ||
Revision as of 16:13, 11 November 2013
11/1/2013
- Goals
- Confirm signals on all of Sector 5's sense wires
- Finish HV burnin: S:F:G = 1500:-750:536 and the current draw is less than 1 uA CLAS12_R1_S5_QA
- After the above is completed, stop gas flow, Install dust covers, prepare for shipping
- Test TDC integrity using DAQ and S1
11/8/2013 Worked with Haitham on Sector 5
Moved Kraken to SL2
Began confirming signals on S5 sense wires
Add missing oscilloscope image SL2-STB6-K1200872 U10
Confirmed with Haitham that HV burin is completed for SL2 Rotated Sector 3 with David
- Available times
- Monday 9-5
- T,Th 9-3
- W,F 12-5
Weekly progress meeting at 10 am Mondays