Difference between revisions of "AW CLAS12R1"

From New IAC Wiki
Jump to navigation Jump to search
Line 4: Line 4:
 
#Confirm signals on all of Sector 5's sense wires
 
#Confirm signals on all of Sector 5's sense wires
 
#Finish HV burnin: S:F:G = 1500:-750:536 and the current draw is less than 1 uA [[CLAS12_R1_S5_QA]]
 
#Finish HV burnin: S:F:G = 1500:-750:536 and the current draw is less than 1 uA [[CLAS12_R1_S5_QA]]
#AFter the above is completed, stop gas flow, Install dust covers, prepare for shipping
+
#After the above is completed, stop gas flow, Install dust covers, prepare for shipping
  
 
;Available times
 
;Available times

Revision as of 15:18, 1 November 2013

11/1/2013

Goals
  1. Confirm signals on all of Sector 5's sense wires
  2. Finish HV burnin: S:F:G = 1500:-750:536 and the current draw is less than 1 uA CLAS12_R1_S5_QA
  3. After the above is completed, stop gas flow, Install dust covers, prepare for shipping
Available times
Monday 9-5
T,Th 9-3
W,F 12-5

CLAS12_R1