|    || 7' + 6' + 3' SS pipe lengths
 
|    || 7' + 6' + 3' SS pipe lengths
 
|-
 
|-
|   || turning pipe on lathe  
+
|   250  || turning pipe on lathe  
 +
|-
 +
|  2400  || 2 days of labor building beam line and 1 day installation
 
|}
 
|}
  

Revision as of 19:27, 25 October 2013

Beam Line Budget

Without 6 cross

Cost ($) Description
318 Bellows
158 Hardware (nuts & bolts)
290 5 rotatable flanges
335 non-rotatable flanges
7' + 6' + 3' SS pipe lengths
250 turning pipe on lathe
2400 2 days of labor building beam line and 1 day installation

With 6 cross

Energy (MeV) dE/dx for e- (MeV/cm) dE/dx for e+ (MeV/cm)
8 4.54 +/- 1.05 4.40 +/- 1.03
5 4.36 +/- 1.11 4.22 +/- 1.08
3 4.12 +/- 1.19 4.03 +/- 1.16