Difference between revisions of "40MeV BeamLineInstall 10252013"

From New IAC Wiki
Jump to navigation Jump to search
 
Line 1: Line 1:
  
 +
=Beam Line Budget=
  
 +
==Without 6cross==
 +
 +
{| border="1"  |cellpadding="20" cellspacing="0
 +
|-
 +
|Cost||Description
 +
|-
 +
|  8    || 4.54 +/- 1.05 ||  4.40  +/-  1.03
 +
|-
 +
|  5    || 4.36 +/- 1.11 ||  4.22 +/- 1.08
 +
|-
 +
|  3  || 4.12 +/- 1.19  ||  4.03 +/- 1.16
 +
|}
 +
 +
== With 6 cross==
 +
 +
{| border="1"  |cellpadding="20" cellspacing="0
 +
|-
 +
|Energy (MeV) || dE/dx for e- (MeV/cm)|| dE/dx for e+ (MeV/cm)
 +
|-
 +
|  8    || 4.54 +/- 1.05 ||  4.40  +/-  1.03
 +
|-
 +
|  5    || 4.36 +/- 1.11 ||  4.22 +/- 1.08
 +
|-
 +
|  3  || 4.12 +/- 1.19  ||  4.03 +/- 1.16
 +
|}
  
  
 
[[Positrons_Using_40Mev_Linac#10.2F14.2F13]]
 
[[Positrons_Using_40Mev_Linac#10.2F14.2F13]]

Revision as of 16:59, 25 October 2013

Beam Line Budget

Without 6cross

Cost Description
8 4.54 +/- 1.05 4.40 +/- 1.03
5 4.36 +/- 1.11 4.22 +/- 1.08
3 4.12 +/- 1.19 4.03 +/- 1.16

With 6 cross

Energy (MeV) dE/dx for e- (MeV/cm) dE/dx for e+ (MeV/cm)
8 4.54 +/- 1.05 4.40 +/- 1.03
5 4.36 +/- 1.11 4.22 +/- 1.08
3 4.12 +/- 1.19 4.03 +/- 1.16


Positrons_Using_40Mev_Linac#10.2F14.2F13