Difference between revisions of "GEM performance data graphs"
Line 203: | Line 203: | ||
|Run Number || Beam || Start Time || End time || Notes | |Run Number || Beam || Start Time || End time || Notes | ||
|- | |- | ||
− | | | + | |6107 || on || 13:37:21 || ||3.2,2.6kV, peak sensing at low channel number |
|- | |- | ||
Revision as of 19:41, 25 September 2013
IAC runs
ADC is connected,
Beam On: run 5496 as the detector is on 13:31:11 13:47:18 run 5497 as the detector is off 13:52:51
Run Number | Beam | Start Time | End time | Notes |
5496 | on | 13:31:11 | 13:47:18 | Detector is in operating voltage. |
5497 | on | 13:52: 51 | Detector is in off mode | |
5515 | off | 5:59: 46 | 6:27:43 | Detector is in operating voltage. |
5516 | off | 6:29:32 | 06:38:13 | Detector is in off mode |
5517 | off | 6:43:42 | 06:50:05 | shutter is close |
5518 | off | 06:55:59 | 07:06:57 | Detector is in operating voltage. |
5519 | on | 07:56:53 | Detector is in operating voltage. | |
5520,21,22 | on | 09:38:36 | Detector is in operating voltage. | |
5523 | on | 9:51:00 | 10:13:38 | Detector is in operating voltage. |
5524 | on | 10:14:35 | PMT is added to ADC ch#14 | |
5526 | on | 11:51:35 | 12:02:49 | PMT TDC ch#0 GEM ch#2 ADC ch# 12 GEM Ch#14 PMT |
5528 | on | 12:21:28 | 13:35:26 | |
5529 | on | 13:36:28 | 14:44:37 | |
5530 | on | 14:45:24 | 15:09:16 | |
5531 | on | 15:09:41 | 15:20:03 | |
5532 | on | 15:23:31 | 15:31:00 | |
5532 | on | 15:23:31 | 16:04:31 | |
5532 | on | 16:05:00 | 16:04:31 | |
5537 | on | 16:22:00 | 16:27:03 | |
5541 | on | 16:42:02 | 16:27:03 |
All the previous runs has a positive input to the ADC.
- Tuesday 07/30/13
Run Number | Beam | Start Time | End time | Notes |
5593 | on | 15:55:04 | 16:29:20 | stable beam to the end of the run. |
5594 | on | 16:36:19 | 17:03:52 | stable beam to the end of the run. |
5595 | on | 08:28:09 | 08:45:19 | stable beam to the end of the run. |
5596 | on | 08:47:16 | 10:06:37 | stable beam to the end of the run. |
5603 | on but trasfered | 13:31:30 | 14:38:02 | shutter is close |
- Wednesday 08/21-22/13
- Detector voltage is 2300, 2800V GEM and Cathode successively. GEM has not any output to the TDC for 5773, 5774.
Run Number | Beam | Start Time | End time | Notes |
5773 | on | beam on for 4-10s, overflow | ||
5774 | on | beam on for 4-10s shutter is close, beam energy is 7.5 MeV | ||
5775 | on | beam on for 4-10s shutter is open, beam energy is 7.5 MeV | ||
5776 | on | beam on for 4-10s shutter is open, beam energy is 7.5 MeV | ||
5777 | on | beam on for 4-10s shutter is close, beam energy is 7.5 MeV | ||
5778 | off | 19:54:17 | 6:00:00 | shutter is close 2.8, 3.4 G/C, Amp.6_6 |
5779 | off | 6:05:33 | shutter is open 2.8, 3.4 G/C, Amp.6_6 |
09/23/13 BeamOn shutter close
ADC : GEM CH#5, Scintillator 11
TDC: GEM CH#27,31 (just 31 gives time hits but it is a kind of weird!!!!!), Scintillator 29
PS-ADC: GEM CH#15
Run Number | Beam | Start Time | End time | Notes |
6087 | on | 11:58:23 | 12:56:30 | , ADC does not collect charge from the scintillator 3.4,2.8kV |
6088 | on | 12:56:58 | beam on, 3.4,2.8kV | |
6089 | on | 13:41:15 | 14:19:01 | , 2.8,2.8kV, run included a beam off then beam on again. |
6090 | on | 14:31:39 | 14:34:45 | 3.4,2.8kV |
6091 | on | 14:36:29 | 15:20:07 | 3.4,2.8kV |
6092 | on | 15:22:16 | 15:41:36 | 3.4,2.8kV |
6093 | on | 15:42:46 | 16:27:24 | 3.4,2.8kV |
6094 | on | 16:28:28 | 16:58:48 | 3.4,2.8kV, high sci. voltage that saturate the ADC, b |
09/24/13 BeamOn shutter open
ADC : GEM CH#5, Scintillator 11
TDC: GEM CH#27,31 (just 31 gives time hits but it is a kind of weird!!!!!), Scintillator 29
PS-ADC: GEM CH#15
Run Number | Beam | Start Time | End time | Notes |
6095 | on | 09:49:48 | 10:35:32 | 3.4,2.8kV, beam turned off twice for a short time |
6096 | on | 10:36:06 | 13:41:58 | 3.4,2.8kV, scin. ADC signal without Amplification |
6097 | on | 13:42:41 | 16:49:59 | 3.4,2.8kV |
6098 | on | 16:50:11 | 17:08:43 | 3.4,2.8kV |
09/25/13 BeamOn shutter open
ADC : GEM CH#5, Scintillator 9,11
TDC: GEM CH#27,31,28 , Scintillator 29
PS-ADC: GEM CH#15
Run Number | Beam | Start Time | End time | Notes |
6100 | on | 08:17:48 | 08:31:49 | 3.3,2.7kV,sci. ampl. is changed for qdc. |
6101 | on | 08:48:59 | 09:04:14 | 3.3,2.7kV |
6102 | on | 09:08:27 | 09:53:58 | 3.3,2.7kV , sci. ADC ch#9 |
6103 | on | 09:55:21 | 10:05:19 | 3.3,2.7kV , beam is off |
6104 | on | 10:06:48 | 10:54:21 | 3.3,2.7kV |
6105 | on | 10:55:08 | 11:43:05 | 3.3,2.7kV |
6106 | on | 11:44:06 | 13:34:49 | 3.3,2.7kV |
09/25/13 BeamOn shutter open
ADC : GEM CH#5, Scintillator 9
TDC: GEM CH#27,31,28 , Scintillator 29
PS-ADC: GEM CH#15
Run Number | Beam | Start Time | End time | Notes |
6107 | on | 13:37:21 | 3.2,2.6kV, peak sensing at low channel number |
IAC-Peak Sensing Measurements 09/01/13