Difference between revisions of "201305 R1ProgressRep"
Line 107: | Line 107: | ||
Carlos: move S1 HV to S5 and begin HV burn in of S5, reinstall other HV modules onto S1 | Carlos: move S1 HV to S5 and begin HV burn in of S5, reinstall other HV modules onto S1 | ||
+ | =5/29/13= | ||
+ | Dion: String S3 with Debbie | ||
+ | |||
+ | Haitham: String S2 with David | ||
+ | |||
+ | David: String S2 with Haitham (left early) | ||
+ | |||
+ | Debbie: String S3 with Dion in morning (left early) | ||
+ | |||
+ | Carlos: Look for signals on S5 | ||
+ | |||
+ | Changed flow rate from 50 down to 30. | ||
[[CLAS12_R1_Progress_Reports#April_2013]] | [[CLAS12_R1_Progress_Reports#April_2013]] |
Revision as of 00:01, 30 May 2013
5/1/13
Dion: String S3 with Debbie
David: String S2 with Haitham, finish segmenting S5 then install HV boards with boots.
Debbie: String S3 with Dion
Haitham: String S2 with David
Carlos: continue Q&A signal documentation of S6
5/8/13
Dion: String S3 with Debbie
Haitham 30 minutes late today
David 1.5 paid leave with notice
Debbie takes the afternoon off
Crimp pin count:
Mass = (2.5-0.7)/10 = 0.18 g/pin
300 + 300 +300 +300 +43 = 1243/0.18 = 6900 pins
5/13/13
Dion: String S3 with Debbie
Haitham: measure tensions in Nose of S2 30 minutes
David: measure tensions in Nose of S2
Debbie: String S3 with Dion
5/14/13
Dion: Install more boots on S5 and insulate HV cable. String S3 with Debbie
Haitham: String S2 with David
David: String S2 with Haitham then prepare S5 for gas purge
Debbie: Arrived at 10 am to String S3 with Dion
5/15/13
Dion: String S3 with Debbie
Haitham: String S2 with David
David: String S2 with Haitham then work on dust covers for S6 with Carlos
Debbie: String S3 with Dion
Carlos: dust covers with David
Purge has begun on S3. Carlos observed and took scope pictures of signals from all S6 sense wires.
5/20/13
Dion: out with food poisoning
Haitham: String S3 with Debbie David: B-day vacation
Debbie: String S3 with Haitham
Carlos: move S1 HV to N1471, change discriminator to 60 mV, dust covers
Increased flow rate from 30 to 50 for gas
5/21/13
Dion: String S3 with Debbie
Haitham: String S2 with David
David: String S2 with Haitham (arrived for work at 10:30)
Debbie: String S3 with Dion
Carlos: dust covers
Lowered flow rate from 50 to 30 until a full bottle arrives.
5/28/13
Dion: String S3 with Debbie
Haitham: String S2 with David
David: String S2 with Haitham
Debbie: String S3 with Dion in morning, off after 1pm
Carlos: move S1 HV to S5 and begin HV burn in of S5, reinstall other HV modules onto S1
5/29/13
Dion: String S3 with Debbie
Haitham: String S2 with David
David: String S2 with Haitham (left early)
Debbie: String S3 with Dion in morning (left early)
Carlos: Look for signals on S5
Changed flow rate from 50 down to 30.