Difference between revisions of "201304 R1ProgressRep"
(→4/8/13) |
(→4/9/13) |
||
| Line 55: | Line 55: | ||
began at 7:35am, icy roads | began at 7:35am, icy roads | ||
| + | |||
| + | |||
| + | =4/11/13= | ||
| + | |||
| + | Dion: took a vacation day | ||
| + | |||
| + | David: String both chambers with Debbie | ||
| + | |||
| + | Debbie: String with David | ||
| + | |||
| + | Haitham: Q&A documentation of signals on S6 | ||
| + | |||
| + | Carlos: restored cosmic test stand PMTs and start to take R1 S1 data with ADB crate | ||
| + | |||
| + | |||
[[CLAS12_R1_Progress_Reports]] | [[CLAS12_R1_Progress_Reports]] | ||
Revision as of 18:51, 12 April 2013
4/1/13
Dion: Will start stringing S3 Field with David at 10 am ,HV test the Cracken
David: String S3 Field with Dion , document pulses from S6 until DIon arrives
Debbie: String S2 Field with Haitham, Document S6 signals in the afternoon
Haitham: String S2 with Debbie
Carlos: Wire tension measurements & CHECK ADB Polarity use STB + pulse generator to inject signals and test ADC->TDC channels
4/4/13
Dion: stringing S3 Field with David at 10 am ,finished the Cracken cable
David: String S3 Field with Dion , work on ADB crate with Carlos
Debbie: String S2 Field with Haitham, Document S6 signals in the afternoon
Haitham: String S2 with Debbie
Carlos: Wire tension measurements & CHECK ADB Polarity use STB + pulse generator to inject signals and test ADC->TDC channels
Stopped work at 5pm
4/8/13
Dion: stringing S3 Field with David at 10 am ,install & test the Cracken cable
David: String S3 Field with Dion , work on ADB crate with Carlos
Debbie: String S2 Field with Haitham, Document S6 signals in the afternoon
Haitham: String S2 with Debbie
Carlos: Wire tension measurements & test ADC->TDC channels
began at 7:35am
4/9/13
Dion: stringing S3 Field with David
David: String S3 Field with Dion
Debbie: String S2 Field with Haitham, Document S6 signals in the afternoon
Haitham: String S2 with Debbie
Carlos: Wire tension measurements & restore cosmic test stand PMTs
began at 7:35am, icy roads
4/11/13
Dion: took a vacation day
David: String both chambers with Debbie
Debbie: String with David
Haitham: Q&A documentation of signals on S6
Carlos: restored cosmic test stand PMTs and start to take R1 S1 data with ADB crate