Difference between revisions of "201304 R1ProgressRep"
(→4/4/13) |
(→4/4/13) |
||
Line 25: | Line 25: | ||
Stopped work at 5pm | Stopped work at 5pm | ||
+ | |||
+ | |||
+ | =4/8/13= | ||
+ | |||
+ | Dion: stringing S3 Field with David at 10 am ,install & test the Cracken cable | ||
+ | |||
+ | David: String S3 Field with Dion , work on ADB crate with Carlos | ||
+ | |||
+ | Debbie: String S2 Field with Haitham, Document S6 signals in the afternoon | ||
+ | |||
+ | Haitham: String S2 with Debbie | ||
+ | |||
+ | Carlos: Wire tension measurements & test ADC->TDC channels | ||
+ | |||
[[CLAS12_R1_Progress_Reports]] | [[CLAS12_R1_Progress_Reports]] |
Revision as of 13:32, 8 April 2013
4/1/13
Dion: Will start stringing S3 Field with David at 10 am ,HV test the Cracken
David: String S3 Field with Dion , document pulses from S6 until DIon arrives
Debbie: String S2 Field with Haitham, Document S6 signals in the afternoon
Haitham: String S2 with Debbie
Carlos: Wire tension measurements & CHECK ADB Polarity use STB + pulse generator to inject signals and test ADC->TDC channels
4/4/13
Dion: stringing S3 Field with David at 10 am ,finished the Cracken cable
David: String S3 Field with Dion , work on ADB crate with Carlos
Debbie: String S2 Field with Haitham, Document S6 signals in the afternoon
Haitham: String S2 with Debbie
Carlos: Wire tension measurements & CHECK ADB Polarity use STB + pulse generator to inject signals and test ADC->TDC channels
Stopped work at 5pm
4/8/13
Dion: stringing S3 Field with David at 10 am ,install & test the Cracken cable
David: String S3 Field with Dion , work on ADB crate with Carlos
Debbie: String S2 Field with Haitham, Document S6 signals in the afternoon
Haitham: String S2 with Debbie
Carlos: Wire tension measurements & test ADC->TDC channels