Difference between revisions of "201304 R1ProgressRep"
(→4/4/13) |
|||
| Line 12: | Line 12: | ||
=4/4/13= | =4/4/13= | ||
| + | |||
| + | Dion: stringing S3 Field with David at 10 am ,finished the Cracken cable | ||
| + | |||
| + | David: String S3 Field with Dion , work on ADB crate with Carlos | ||
| + | |||
| + | Debbie: String S2 Field with Haitham, Document S6 signals in the afternoon | ||
| + | |||
| + | Haitham: String S2 with Debbie | ||
| + | |||
| + | Carlos: Wire tension measurements & CHECK ADB Polarity use STB + pulse generator to inject signals and test ADC->TDC channels | ||
| + | |||
Stopped work at 5pm | Stopped work at 5pm | ||
[[CLAS12_R1_Progress_Reports]] | [[CLAS12_R1_Progress_Reports]] | ||
Revision as of 23:01, 4 April 2013
4/1/13
Dion: Will start stringing S3 Field with David at 10 am ,HV test the Cracken
David: String S3 Field with Dion , document pulses from S6 until DIon arrives
Debbie: String S2 Field with Haitham, Document S6 signals in the afternoon
Haitham: String S2 with Debbie
Carlos: Wire tension measurements & CHECK ADB Polarity use STB + pulse generator to inject signals and test ADC->TDC channels
4/4/13
Dion: stringing S3 Field with David at 10 am ,finished the Cracken cable
David: String S3 Field with Dion , work on ADB crate with Carlos
Debbie: String S2 Field with Haitham, Document S6 signals in the afternoon
Haitham: String S2 with Debbie
Carlos: Wire tension measurements & CHECK ADB Polarity use STB + pulse generator to inject signals and test ADC->TDC channels
Stopped work at 5pm