Difference between revisions of "201304 R1ProgressRep"

From New IAC Wiki
Jump to navigation Jump to search
(Created page with "=3/27/13= Dion: Will start stringing S3 Field with David at 10 am ,HV test the Cracken David: String S3 Field with Dion , document pulses from S6 until DIon arrives Debbie: S…")
 
Line 1: Line 1:
=3/27/13=
+
=4/1/13=
  
 
Dion: Will start stringing  S3 Field with David at 10 am ,HV test the Cracken
 
Dion: Will start stringing  S3 Field with David at 10 am ,HV test the Cracken
Line 11: Line 11:
 
Carlos: Wire tension measurements & CHECK ADB Polarity use STB + pulse generator to inject signals and test ADC->TDC channels
 
Carlos: Wire tension measurements & CHECK ADB Polarity use STB + pulse generator to inject signals and test ADC->TDC channels
  
 +
=4/4/13=
 +
 +
Stopped work at 5pm
  
 
[[CLAS12_R1_Progress_Reports]]
 
[[CLAS12_R1_Progress_Reports]]

Revision as of 22:59, 4 April 2013

4/1/13

Dion: Will start stringing S3 Field with David at 10 am ,HV test the Cracken

David: String S3 Field with Dion , document pulses from S6 until DIon arrives

Debbie: String S2 Field with Haitham, Document S6 signals in the afternoon

Haitham: String S2 with Debbie

Carlos: Wire tension measurements & CHECK ADB Polarity use STB + pulse generator to inject signals and test ADC->TDC channels

4/4/13

Stopped work at 5pm

CLAS12_R1_Progress_Reports