Difference between revisions of "201303 R1ProgressRep"
Line 69: | Line 69: | ||
=3/19/13= | =3/19/13= | ||
− | Dion: String | + | Dion: String S3 Field with David |
− | David: String | + | David: String S3 with Dion |
− | Debbie: String S2 | + | Debbie: sick day |
+ | Haitham: Look for signals on S6 then String Field S2 when Debbie arrives | ||
+ | |||
+ | Carlos: Wire tension measurements & ADB crate install | ||
+ | |||
+ | =3/20/13= | ||
+ | |||
+ | Dion: String S2 Field with David | ||
+ | |||
+ | David: String S2 with Dion | ||
+ | |||
+ | Debbie: sick day | ||
Haitham: Look for signals on S6 then String Field S2 when Debbie arrives | Haitham: Look for signals on S6 then String Field S2 when Debbie arrives | ||
Revision as of 20:24, 20 March 2013
3/4/13
Dion: String S3 with David
David: Stringing S3 Guard
Debbie: String S2 in the morning, HV burn in S6 in the afternoon
Haitham: String Guard on S2
Carlo: HV burn in & signal search S6
Progress:
A super layer of guard wires has been strung on both S2 & S3.
Should be finished with Guard wires by next week
3/5/13
Dion: String S3 with David
David: Stringing S3 Guard
Debbie: String S2 in the morning, HV burn in S6 SL2-HVB6 in the afternoon
Haitham: String Guard on S2
Carlo: HV burn in SL2-HVB6
3/7/13
Signals observed on all channels of S2 SL2 HVB5.
3/11/13
Dion: String S3 Field with David
David: Stringing S3 Field
Debbie: String S2 in the morning, HV burn in S6 SL2-HVB5 in the afternoon
Haitham: String Field S2
Carlo: HV burn in SL2-HVB5
3/18/13
Dion: String S3 Field with David
David: Stringing S3 Field
Debbie: String S2 in the morning, Look for signals on STB5
Haitham: String Field S2
Carlos: Wire tension measurements & ADB crate checkout
3/19/13
Dion: String S3 Field with David
David: Stringing S3 Field
Debbie: String S2 in the morning, Debbie needs time off after lunch
Haitham: String Field S2
Carlos: Wire tension measurements & ADB crate install
3/19/13
Dion: String S3 Field with David
David: String S3 with Dion
Debbie: sick day Haitham: Look for signals on S6 then String Field S2 when Debbie arrives
Carlos: Wire tension measurements & ADB crate install
3/20/13
Dion: String S2 Field with David
David: String S2 with Dion
Debbie: sick day Haitham: Look for signals on S6 then String Field S2 when Debbie arrives
Carlos: Wire tension measurements & ADB crate install