Difference between revisions of "2n BKG data"
Jump to navigation
Jump to search
Line 6: | Line 6: | ||
2 Al sheets as bremsstrahlung radiator; | 2 Al sheets as bremsstrahlung radiator; | ||
+ | |||
+ | Detector G: HV(G1) = -1700 V, HV(G2) = -1650 V. | ||
+ | |||
+ | There was 2" of lead in front of the Det G. |
Revision as of 21:26, 7 December 2012
, , ,
Upstream collimator diamater = 0.25"
Downstream collimator diamater = 2.0"
2 Al sheets as bremsstrahlung radiator;
Detector G: HV(G1) = -1700 V, HV(G2) = -1650 V.
There was 2" of lead in front of the Det G.