Difference between revisions of "TF IsotopeTracers"
(→Budget) |
(→Budget) |
||
Line 51: | Line 51: | ||
| 50,000 || BPMs || 4 electron beam position monitors | | 50,000 || BPMs || 4 electron beam position monitors | ||
|- | |- | ||
− | | | + | | 20,000 ||16, CVD Diamond detector || Off the shelf single crystal single pixel detector pg 49 in[ http://www.npl.co.uk/upload/pdf/091104_nuc_galbiati.pdf] |
|- | |- | ||
| 10,000 || 20 , 5 x 5 mm^2 CVD films || films for pixel detector array | | 10,000 || 20 , 5 x 5 mm^2 CVD films || films for pixel detector array | ||
Line 60: | Line 60: | ||
|- | |- | ||
| 30,000 || beam time || 3 weeks of beam time to test device and measure performance | | 30,000 || beam time || 3 weeks of beam time to test device and measure performance | ||
+ | |- | ||
+ | |$25k ||DAQ || VME based DAQ system with EPICs monitoring, 32 channel ADC ($6k), ROC($3k), MiniCrate($4k), Server ($2k), Tigger supervisor ($3k), NIM Discriminator /Trigger/ECL output module ($10k) | ||
|- | |- | ||
|} | |} |
Revision as of 17:08, 2 December 2012
Nitrogen tracers: N-15 is rare. If you dope nitrogen sources with it you can see where the leak into environment. This is a stable tracer so it would be able to monitor long time plume expansions.
Catchment hydrology
High Flux MeV photon profiler
http://accelconf.web.cern.ch/accelconf/p99/PAPERS/WEA90.PDF
http://ieeexplore.ieee.org/ielx5/5379507/5398121/05398374.pdf?tp=&arnumber=5398374&isnumber=5398121
CVD Diamond film
Film Vendor only
http://www.e6cvd.com/cvd/page.jsp?pageid=415
Alemeda Applied Sciences Corporation
http://www.aasc.net/drds http://www.aasc.net/media/DRD-AppNote.pdf
Diamond x-ray view screen http://www.diamond-materials.com/EN/products/cvd_for_xray/fluorescence_beam_monitors.htm
http://www.npl.co.uk/upload/pdf/091104_nuc_galbiati.pdf
NIM paper from 2002
http://144.206.159.178/ft/787/47160/14168748.pdf
Diamond Detectors LtD (Vendor for single crystal Chip on Board Package)
http://www.npl.co.uk/upload/pdf/091104_nuc_galbiati.pdf
Budget
Equipment list
two steps
1.) purchase single crystal detector from http://www.npl.co.uk/upload/pdf/091104_nuc_galbiati.pdf
2.) get http://www.npl.co.uk/upload/pdf/091104_nuc_galbiati.pdf to build a pixelated 3 x 3 cm detector with .5 x .5 cm size pixels (36 pixels)
Cost | Device | Purpose |
50,000 | BPMs | 4 electron beam position monitors |
20,000 | 16, CVD Diamond detector | Off the shelf single crystal single pixel detector pg 49 in[ http://www.npl.co.uk/upload/pdf/091104_nuc_galbiati.pdf] |
10,000 | 20 , 5 x 5 mm^2 CVD films | films for pixel detector array |
30,000 | Flanges and crosses | Beam line components for BPMs |
10,000 | Circuitry | PCB board, connectors, and single crystal mounting by external vendor |
30,000 | beam time | 3 weeks of beam time to test device and measure performance |
$25k | DAQ | VME based DAQ system with EPICs monitoring, 32 channel ADC ($6k), ROC($3k), MiniCrate($4k), Server ($2k), Tigger supervisor ($3k), NIM Discriminator /Trigger/ECL output module ($10k) |