Difference between revisions of "Beam Test Jul 23 2012"

From New IAC Wiki
Jump to navigation Jump to search
Line 16: Line 16:
 
  3638  8 Hz    in  in  DL=5,DR=4  10:24:05      10:27:45      2.51
 
  3638  8 Hz    in  in  DL=5,DR=4  10:24:05      10:27:45      2.51
 
  3639  100 Hz  in  in  DL=5,DR=4  10:31:04      10:31:04      8.1764
 
  3639  100 Hz  in  in  DL=5,DR=4  10:31:04      10:31:04      8.1764
  3640  100 Hz  in  out  DL=5,DR=4  11:33:00      11:33:00      11:33:00
+
  3640  100 Hz  in  out  DL=5,DR=4  11:33:00      11:33:00      7.5097
 +
3640  100 Hz  in  out  DL=5,DR=4  11:33:00     12:33:02

Revision as of 18:30, 23 July 2012

Tune and deliver positrons

Tune it to Chad's tune from last run: Beam_Test_Jul_20_2012#Chad.27s_Tune

Positrons observed on the 90 degree scintilator.

DAQ runs

Detector2 -> Detector Beam Left (DL)-> CH6. IAC_NaI_Detectors#Det2

Detector3 -> Detector Beam Right (DR)-> CH5. IAC_NaI_Detectors#Det3

Run#  Reprate T1  T2   FADC THR   Start Time    Stop Time     Int Rate(Events/S)
3636  8 Hz    in  in   DL=5,DR=4  09:49:49      10:03:39      2.4334
3637  8 Hz    in  in   DL=5,DR=4  10:04:08      10:20:16      2.1641
3638  8 Hz    in  in   DL=5,DR=4  10:24:05      10:27:45      2.51
3639  100 Hz  in  in   DL=5,DR=4  10:31:04      10:31:04      8.1764
3640  100 Hz  in  out  DL=5,DR=4  11:33:00      11:33:00      7.5097
3640  100 Hz  in  out  DL=5,DR=4  11:33:00      12:33:02