Difference between revisions of "PePPO 2012Run"
Jump to navigation
Jump to search
Line 4: | Line 4: | ||
Positrons may be In May | Positrons may be In May | ||
− | The main electron beam current needs to be limited to 10 nA. | + | The main electron beam current needs to be limited to 10 nA using a beam line cavity. |
Currently max energy is 7.8 MeV. | Currently max energy is 7.8 MeV. |
Revision as of 16:11, 23 November 2011
Run Configuration
Positrons may be In May
The main electron beam current needs to be limited to 10 nA using a beam line cavity.
Currently max energy is 7.8 MeV.
Choosing 6.3 MeV incident electron energy because that is the most stable.
= 0.5 mm on the Tungsten target (T1)
Date | Task/Item |
Jan 22, 2012 | Readiness Review |