Difference between revisions of "Beamline design (Y. Kim)"
Jump to navigation
Jump to search
Line 3: | Line 3: | ||
− | Need: more X-Y steerers(1 set after 1st triplet), belows at the exit of Linac, Torroid loop at exit of Linac, fast shutdown valve at Linac exit. | + | Need: more X-Y steerers(1 set after 1st triplet), belows at the exit of Linac, Torroid loop at exit of Linac, fast shutdown valve at Linac exit. |
== Distances== | == Distances== |
Latest revision as of 18:53, 21 March 2011
Beam Line Design
Need: more X-Y steerers(1 set after 1st triplet), belows at the exit of Linac, Torroid loop at exit of Linac, fast shutdown valve at Linac exit.
Distances
Element | Distance to Center | Stancari Design |
End of LinacGate Valve | 0.000 m | |
Q1@T1 | 0.175 m | |
Q2@T1 | 0.425 m | |
Q3@T1 | 0.675 m | |
TCOL1 | 1.025 m | |
1STTG | 1.175 m | |
Q1@T2 | 1.400 m | 1.4 |
Q2@T2 | 1.650 m | 1.6 (Yujong has 5 cm more space between quads) |
Q3@T2 | 1.900 m | 1.8 |
TCOL2 | 2.250 m | |
KIWI1 | 2.525 m | 2.201 (Yujong has 22.4 cm more distance between last quad and dipole) |
SLIT | 2.851 m | |
Q1@DM | 3.026 m | 2.615 (Yujong has 8.7 more cm between dipole and quad) |
SCREEN | 3.296 m | |
KIWI2 | 3.617 m | |
Q1@T3 | 4.063 m | Yujong has 29.1 cm leess distance between last dipole and quad) |
Q2@T3 | 4.603 m | |
Q3@T3 | 5.143 m | |
SCREEN | 5.712 m | |
2NDTG | 6.112 m | |
HOLE@WALL | 6.412 m |
Beam Optics
Beam Size
Expected electron Transmission
- Assuming a 9 mm wide slit in between the kiwi dipoles.