HRRL Move 2010: Difference between revisions

From New IAC Wiki
Jump to navigation Jump to search
Oborn (talk | contribs)
Created page with '=Timeline= =Tasks= 1.) Alignment: a.) spare gun b.) laser with targets mounted on wall. =Design preference= Thin aluminum target for OTR right after 3 quads place at exit ...'
 
Oborn (talk | contribs)
Line 1: Line 1:
=Timeline=
=Timeline=
{| border="1"  |cellpadding="20" cellspacing="0
|-
|Start Date || Finish Date  || Task
|-
| 10/1/10 || 11/1/10 || Move the HRRL and construct new beamline
|-
| 11/1/10 || 11/15/10  ||    Measure Radiation Field and Prepare for Hunt Run
|-
| 11/15/10    || 12/17/10  ||  Hunt Beam Time (3 MeV, 300 Hz, multiple pulsing)
|-
| 1/3/10 || 1/14/10 ||  Prepare for high current emmittance measurements
|-
| 1/18/10 || 1/21/10 ||  high current emmittance measurements (10 MeV, 50 ns pulse width, variable rep rate and current)
|-
|}


=Tasks=
=Tasks=

Revision as of 14:56, 2 September 2010

Timeline

Start Date Finish Date Task
10/1/10 11/1/10 Move the HRRL and construct new beamline
11/1/10 11/15/10 Measure Radiation Field and Prepare for Hunt Run
11/15/10 12/17/10 Hunt Beam Time (3 MeV, 300 Hz, multiple pulsing)
1/3/10 1/14/10 Prepare for high current emmittance measurements
1/18/10 1/21/10 high current emmittance measurements (10 MeV, 50 ns pulse width, variable rep rate and current)

Tasks

1.) Alignment: a.) spare gun b.) laser with targets mounted on wall.


Design preference

Thin aluminum target for OTR right after 3 quads place at exit to Linac