Difference between revisions of "HRRL Move 2010"
Jump to navigation
Jump to search
(Created page with '=Timeline= =Tasks= 1.) Alignment: a.) spare gun b.) laser with targets mounted on wall. =Design preference= Thin aluminum target for OTR right after 3 quads place at exit ...') |
|||
Line 1: | Line 1: | ||
=Timeline= | =Timeline= | ||
+ | {| border="1" |cellpadding="20" cellspacing="0 | ||
+ | |- | ||
+ | |Start Date || Finish Date || Task | ||
+ | |- | ||
+ | | 10/1/10 || 11/1/10 || Move the HRRL and construct new beamline | ||
+ | |- | ||
+ | | 11/1/10 || 11/15/10 || Measure Radiation Field and Prepare for Hunt Run | ||
+ | |- | ||
+ | | 11/15/10 || 12/17/10 || Hunt Beam Time (3 MeV, 300 Hz, multiple pulsing) | ||
+ | |- | ||
+ | | 1/3/10 || 1/14/10 || Prepare for high current emmittance measurements | ||
+ | |- | ||
+ | | 1/18/10 || 1/21/10 || high current emmittance measurements (10 MeV, 50 ns pulse width, variable rep rate and current) | ||
+ | |- | ||
+ | |} | ||
=Tasks= | =Tasks= |
Revision as of 14:56, 2 September 2010
Timeline
Start Date | Finish Date | Task |
10/1/10 | 11/1/10 | Move the HRRL and construct new beamline |
11/1/10 | 11/15/10 | Measure Radiation Field and Prepare for Hunt Run |
11/15/10 | 12/17/10 | Hunt Beam Time (3 MeV, 300 Hz, multiple pulsing) |
1/3/10 | 1/14/10 | Prepare for high current emmittance measurements |
1/18/10 | 1/21/10 | high current emmittance measurements (10 MeV, 50 ns pulse width, variable rep rate and current) |
Tasks
1.) Alignment: a.) spare gun b.) laser with targets mounted on wall.
Design preference
Thin aluminum target for OTR right after 3 quads place at exit to Linac