Difference between revisions of "HRRL 7-30-09"
Jump to navigation
Jump to search
Line 93: | Line 93: | ||
|HV S:F:G | |HV S:F:G | ||
|- | |- | ||
− | | 1|| 0 || || 1400:-700:980 | + | | 1|| 0 || || || 1400:-700:980 |
|- | |- | ||
|} | |} |
Revision as of 17:25, 30 July 2009
Default HRRL running Conditions
Pulse Width | Rep Rate | Energy | |
8 mA | 100 ns | 1 Hz | 3 MeV |
cable names
CH ID | Description |
2223A1 | Front Scintillator |
2223A2 | Rear Scintilaltor |
2223A3 | ADC Gate From counting house to Experimental Cell |
2223A4 | TDC start pulse from counting house to experimental cell |
2223A5 | |
2223A6 | Metalica sense wire 4 |
2223A7 | G0 MCLK for |
2223A8 | Plastica sense wire 4 |
2223A9 | scaler channel 4 |
2223A10 | Front scintillator to ADC |
2223A11 | scaler channel 1 |
2223A12 | DAQ trigger |
HV Cables on DCs: Sense-A2, Guard-A3 and Field-A4
HV Chan | Description |
N470 Ch 0 | Drift Chamber Sense |
N470 Ch 1 | Drift Chamber field |
N470 Ch 2 | Drift Chamber guard |
N470 Ch 3 | nothing |
N471 Ch A | R1 drift |
N471 Ch B | R1 foil |
N471 Ch A | Front and read PMTs |
HV cables on scintillators: Front && rear PMTs-A8. Hv settings 1150 Volts(works). In counting room front-A1(BNC) and rear-A2(BNC).
Plan: A3 should be gate. A4 - Start for TDC. A12-trigger.
HV Settings on drift chambers S:F:G=1400:-700:980
Setup TIming
Accelerator sends the Gun gate to HRRL counting room on channel BM
The accelerator Gun gate starts our Stanford pulse generator.
- The Stanford pulse generator outputs 2 pulses
- one pulse is for the ADC gate and G1 trigger for V1495
- The second pulse create a trigger for the DAQ
Singles scaler counts
Run Number | Distance to Endplate (cm) | Metalica scaler counts | Plastica Scaler Counts | HV S:F:G |
1 | 0 | 1400:-700:980 |