Difference between revisions of "Mini-prototype"
Jump to navigation
Jump to search
Line 4: | Line 4: | ||
==Cosmic tests== | ==Cosmic tests== | ||
===scope pulses=== | ===scope pulses=== | ||
+ | === General Operating Condition=== | ||
+ | describe gas used, HV, signal electronics | ||
+ | === DAQ=== | ||
+ | describe the DAQ for measuring detector output | ||
== Electron test facility== | == Electron test facility== |
Revision as of 22:11, 10 August 2007
Drift Chamber prototypes were constructed to evaluate drift chamber designs for CLAS12
Mini-prototype Performance Measurements
Cosmic tests
scope pulses
General Operating Condition
describe gas used, HV, signal electronics
DAQ
describe the DAQ for measuring detector output
Electron test facility
IAC 25 MeV electron accelerator
secondary electron beam setup
Description of collimation system goes here as well as lead pencil target. Description of how beam size will be measured or why it isn't needed.