Difference between revisions of "Signal cable timing"

From New IAC Wiki
Jump to navigation Jump to search
Line 45: Line 45:
 
| Top  
 
| Top  
 
| D90T003  
 
| D90T003  
 +
|3
 
| +1  <!--Top delta t from D30T001-->
 
| +1  <!--Top delta t from D30T001-->
 
| rowspan="2" | +10.5  <!--Bottom minus top-->
 
| rowspan="2" | +10.5  <!--Bottom minus top-->
Line 51: Line 52:
 
|  Bot  
 
|  Bot  
 
| D90B004
 
| D90B004
 +
|4
 
| +11.5  <!--Bottom delta t from D30T001-->
 
| +11.5  <!--Bottom delta t from D30T001-->
  

Revision as of 22:12, 17 August 2016

Go back

Procedure

PMT timing relative to D30T001 is measured by splitting a pulse from a pulse generator.

PMT top-bottom difference is the mean time difference of the PMT's using data from the TDC spectrum of a coincidence run with the CF-252 source. The source was placed in the center of all detectors and 150.5 cm above the floor. The trigger detector was located 5.5 cm below the very bottom of the source.

run info

Detectors D30(Red) and D90(yellow):

   run #5214  t=1475 seconds

Results

Detector PMT sig. cable Variable index* [math]\Delta t[/math] relative to D30T001 [ns] PMT bot - PMT top [ns] Run #
angle color


30 Red Top D30T001 1 +0 (by definition) +12.5 r????
Bot D30B002 2 +12.5
90 Yellow Top D90T003 3 +1 +10.5
Bot D90B004 4 +11.5
150 Blue Top D150T005 +1 +13 r5217
Bot D150B006 +14
225 Wood Top D225T007 -3 +23
Bot D225B008 +20

Trigger plugged into patch panel 223A15 : -8 ns