Difference between revisions of "PbBi BeamLine Elements"

From New IAC Wiki
Jump to navigation Jump to search
Line 2: Line 2:
 
[[Image:PositronBeamLine_Layout.jpg | 200 px]]
 
[[Image:PositronBeamLine_Layout.jpg | 200 px]]
  
This picture shows you the current 90 degree bend into the experimental hall.  Quad 1 and Quad 2 are shown and then the 2nd Dipole magnet (labeled Bending Magnet 2A a.k.a. Dipole 2) begins after Quad 1 and Quad 2.  Dipole 2 is following by another Quad doublet and then a Dipole (Dipole 3) and then a final quad doublet before going through the wall into the experimental cell.
+
This picture shows you the current 90 degree bend into the experimental hall.  Quad 1 and Quad 2 are shown and then the 2nd Dipole magnet (labeled Bending Magnet 2A a.k.a. Dipole 2) begins after Quad 1 and Quad 2.   
 
 
  
 
[[Image:IAC_25MeV_90DegreeBend_11-08-07.jpg | 200 px]]
 
[[Image:IAC_25MeV_90DegreeBend_11-08-07.jpg | 200 px]]

Revision as of 22:53, 14 May 2015

Beam Line Elements

PositronBeamLine Layout.jpg

This picture shows you the current 90 degree bend into the experimental hall. Quad 1 and Quad 2 are shown and then the 2nd Dipole magnet (labeled Bending Magnet 2A a.k.a. Dipole 2) begins after Quad 1 and Quad 2.

IAC 25MeV 90DegreeBend 11-08-07.jpg

Dipole

Label on side of Dipole 1

IAC 25MeV Dipole1 Label 11-08-07.jpg

Label on side of Dipole 2

IAC 25MeV Dipole2 Label 11-08-07.jpg


IAC 25B Dipole.jpg

Quads

IAC 25B Quads.jpg


The Quad doublets in the current beam line have the following label.

IAC 25MeV QuadDoublet Label 11-08-07.jpg

Quad doublet size:

QuadDoublet Width.jpg

QuadDoublet Length.jpg

QuadDoublet CoilSize.jpg


G4Beamline_PbBi#Beam_Line_Design