Difference between revisions of "201403 R1ProgressRep"
Jump to navigation
Jump to search
Line 15: | Line 15: | ||
Check that brass screws for windows are in. | Check that brass screws for windows are in. | ||
+ | Shrink wrap for the last two chambers. | ||
[[CLAS12_R1_Progress_Reports#February_2014]] | [[CLAS12_R1_Progress_Reports#February_2014]] |
Revision as of 16:38, 7 March 2014
March 7 2014
- Delays prevented Windows from being installed. They should be installed this weekend.
- Final plugs and standoffs will be glued in today
- remove chamber from clean room Sunday
- Get shipping pallets for lifts, A-frames, the last chamber, and small equipment
- Schedule pickup for Friday March 28 so the chamber arrives at JLab during the following week
Plan is to wire wrap, install boards, HV test to 100 Volts in air, and install board covers.
Get Carriage bolts for drift chamber lifting frame
Check that brass screws for windows are in.
Shrink wrap for the last two chambers.