Line 27: Line 27:
 
{| border="1"  |cellpadding="20" cellspacing="0  
 
{| border="1"  |cellpadding="20" cellspacing="0  
 
|-
 
|-
|Energy (MeV) || dE/dx for e- (MeV/cm)|| dE/dx for e+ (MeV/cm)
+
|Cost ($)||Description
 
|-
 
|-
8    || 4.54 +/- 1.05 ||  4.40  +/- 1.03
+
|| 5 mil exit window
 
|-
 
|-
5    || 4.36 +/- 1.11 ||  4.22 +/- 1.08
+
221|| glass exit window for beam view screen
 
|-
 
|-
|| 4.12 +/- 1.19 || 4.03 +/- 1.16
+
232  || 4 rotatable flanges
 +
|-
 +
|  268 || 4 non-rotatable flanges
 +
|-
 +
|    || 6 " SS beam pipe
 +
|-
 +
|  800  || 1 day of labor building 6 way cross
 
|}
 
|}
  
  
 
[[Positrons_Using_40Mev_Linac#10.2F14.2F13]]
 
[[Positrons_Using_40Mev_Linac#10.2F14.2F13]]

Revision as of 19:30, 25 October 2013

Beam Line Budget

Without 6 cross

Cost ($) Description
318 Bellows
158 Hardware (nuts & bolts)
290 5 rotatable flanges
335 non-rotatable flanges
7' + 6' + 3' SS pipe lengths
250 turning pipe on lathe
2400 2 days of labor building beam line and 1 day installation

With 6 cross

Cost ($) Description
0 5 mil exit window
221 glass exit window for beam view screen
232 4 rotatable flanges
268 4 non-rotatable flanges
6 " SS beam pipe
800 1 day of labor building 6 way cross


Positrons_Using_40Mev_Linac#10.2F14.2F13