Difference between revisions of "40MeV BeamLineInstall 10252013"
Jump to navigation
Jump to search
| Line 6: | Line 6: | ||
{| border="1" |cellpadding="20" cellspacing="0 | {| border="1" |cellpadding="20" cellspacing="0 | ||
|- | |- | ||
| − | |Cost||Description | + | |Cost ($)||Description |
|- | |- | ||
| − | | | + | | 318 || Bellows |
|- | |- | ||
| − | | | + | | 158 || Hardware (nuts & bolts) |
|- | |- | ||
| − | | | + | | 290 || 5 rotatable flanges |
| + | |- | ||
| + | | 335 || non-rotatable flanges | ||
| + | |- | ||
| + | | || 7' + 6' + 3' SS pipe lengths | ||
| + | |- | ||
| + | | || turning pipe on lathe | ||
|} | |} | ||
Revision as of 19:20, 25 October 2013
Beam Line Budget
Without 6 cross
| Cost ($) | Description |
| 318 | Bellows |
| 158 | Hardware (nuts & bolts) |
| 290 | 5 rotatable flanges |
| 335 | non-rotatable flanges |
| 7' + 6' + 3' SS pipe lengths | |
| turning pipe on lathe |
With 6 cross
| Energy (MeV) | dE/dx for e- (MeV/cm) | dE/dx for e+ (MeV/cm) |
| 8 | 4.54 +/- 1.05 | 4.40 +/- 1.03 |
| 5 | 4.36 +/- 1.11 | 4.22 +/- 1.08 |
| 3 | 4.12 +/- 1.19 | 4.03 +/- 1.16 |