1.) pump down chamber | |||
2.) backfill with argon to 1atm | |||
3.) heat top at full power by plugging into wall directly, the other heaters use a rheostat | |||
4.) 360 watts applied to mid center until temperature at bottom flange is 120 C | |||
5.) turn on the other heaters at 20 % of 120 volts until the temperature warms to at least 40 C | |||
6.) vent if the pressure go above 2 ATM | |||
7.) once loop is about 40 C or more, increase rheostats to 40% of 120 volts | |||
8.) top reservoir will be kept heating at full power until maxing out at 300 C then you can turn it off when bottom well is liquid | |||
9.) at 70 C in the well increase reostat to 60% | |||
10.) unplugged top heater when it hits 289 C, temp in middle of loop was 280 | |||
11.) when well temp was 170 C , the high power heater (right side) is increased to 100 % while all other heaters are turned off | |||
12.) | |||
Once well is the hottest you can turn off top reservoir heater | |||
20 C difference between top center and well right | |||
4 = top center | |||
3=center left | |||
2 = well right | |||
1=well left | |||
20 mill windows | |||
4mm target window | |||
5 kg of eutectic 45/55 ratio | |||
Heat tape is rated at120 volts at 300 watts | |||
[[User_talk:Foretony]] | [[User_talk:Foretony]] | ||
Revision as of 19:25, 25 July 2013
PB-Bi liquid target operation
1.) pump down chamber 2.) backfill with argon to 1atm 3.) heat top at full power by plugging into wall directly, the other heaters use a rheostat 4.) 360 watts applied to mid center until temperature at bottom flange is 120 C 5.) turn on the other heaters at 20 % of 120 volts until the temperature warms to at least 40 C 6.) vent if the pressure go above 2 ATM 7.) once loop is about 40 C or more, increase rheostats to 40% of 120 volts 8.) top reservoir will be kept heating at full power until maxing out at 300 C then you can turn it off when bottom well is liquid 9.) at 70 C in the well increase reostat to 60% 10.) unplugged top heater when it hits 289 C, temp in middle of loop was 280 11.) when well temp was 170 C , the high power heater (right side) is increased to 100 % while all other heaters are turned off 12.)
Once well is the hottest you can turn off top reservoir heater
20 C difference between top center and well right
4 = top center 3=center left 2 = well right 1=well left
20 mill windows
4mm target window
5 kg of eutectic 45/55 ratio
Heat tape is rated at120 volts at 300 watts