Difference between revisions of "201304 R1ProgressRep"

From New IAC Wiki
Jump to navigation Jump to search
Line 12: Line 12:
  
 
=4/4/13=
 
=4/4/13=
 +
 +
Dion: stringing  S3 Field with David at 10 am ,finished the  Cracken cable
 +
 +
David: String S3 Field with Dion , work on ADB crate with Carlos
 +
 +
Debbie: String S2 Field with Haitham, Document S6 signals in the afternoon
 +
 +
Haitham: String S2 with Debbie
 +
 +
Carlos: Wire tension measurements & CHECK ADB Polarity use STB + pulse generator to inject signals and test ADC->TDC channels
 +
  
 
Stopped work at 5pm
 
Stopped work at 5pm
  
 
[[CLAS12_R1_Progress_Reports]]
 
[[CLAS12_R1_Progress_Reports]]

Revision as of 23:01, 4 April 2013

4/1/13

Dion: Will start stringing S3 Field with David at 10 am ,HV test the Cracken

David: String S3 Field with Dion , document pulses from S6 until DIon arrives

Debbie: String S2 Field with Haitham, Document S6 signals in the afternoon

Haitham: String S2 with Debbie

Carlos: Wire tension measurements & CHECK ADB Polarity use STB + pulse generator to inject signals and test ADC->TDC channels

4/4/13

Dion: stringing S3 Field with David at 10 am ,finished the Cracken cable

David: String S3 Field with Dion , work on ADB crate with Carlos

Debbie: String S2 Field with Haitham, Document S6 signals in the afternoon

Haitham: String S2 with Debbie

Carlos: Wire tension measurements & CHECK ADB Polarity use STB + pulse generator to inject signals and test ADC->TDC channels


Stopped work at 5pm

CLAS12_R1_Progress_Reports